SVHeat - 3D Gallery - Mining

Pinching

preprocessor

postprocessor
This example shows the ability of the software to pinch out layers and model complex 3D structures. A hollow stope is created in the center of the problem.
Model setup time: 60 minutes
Solution time: 41seconds on PIII-1.0 GHz
Nodes: 2963

Resevoir

preprocessor

postprocessor
A resevoir is created in this problem in which heat is pumped from the problem from thermosyphons.
Model setup time: 60 minutes
Solution time: 43 seconds on PIII-1.0 GHz
Nodes: 14,248

Stope

preprocessor

postprocessor
A stope is created in this problem. The problem illustrates the ability of SVHeat to model complex underground structures.
Model setup time: 60 minutes
Solution time: 10 seconds on PIII-1.0 GHz
Nodes: 1424