SVHeat - 2D Gallery - Underground
Mining Structures

| Stope Front |

preprocessor |

postprocessor |
This
example illustrates the use of SVHeat to model a complex cross-section
of a mine stope. The cross section was imported from an AutoCAD
DXF file and input into the model. The cross-section represents
the side view of a mine stope.
Model setup time: 40 minutes
Solution time: 53 seconds on PIII-1.0 GHz
Nodes: 2895 |
| Stope Side |

preprocessor |

postprocessor |
This
example illustrates the use of SVHeat to model a complex cross-section
of a mine stope. The cross section was imported from an AutoCAD
DXF file and input into the model. The cross-section represents
the end view of a mine stope.
Model setup time: 40 minutes
Solution time: 35 seconds on PIII-1.0 GHz
Nodes: 2263 |

|