svflux.com
QUICK LINKS
HOT NEWS

Upcoming Events
GeoCongress 2008
Geohazards 2008

New Application Examples
Landfill Slope Stability
Cover Design
Tailings Drain-Down
Heap Leach Pad Analysis

More Hot News...

SPECIALS

Free SoilVision Professional!
Purchase SVOffice 2006 Elite and receive SoilVision Professional for free. Pricing details are available here.

25-user Student Edition
Student editions are available in all of our finite element packages. They are perfect for the teaching environment.

Each package now includes online user and tutorial manuals. Click here for pricing.

Untitled Document

ChemFlux- 2D Gallery - Waste Containment Problems

Plug Flow

preprocessor

postprocessor
This example shows the flow of a plug of contamination released at ground surface for a time duration. Results are benchmarked against MT3D.
Model setup time: 2.5 hrs
Solution time: 6 min 13 seconds on PIII-1.0 GHz

Clay Dam

preprocessor

postprocessor
This example shows the calculation of contaminant movement through a clay dam.
Model setup time: 14 minutes
Solution time: 9 seconds on PIII-1.0 GHz

Earth Dam

preprocessor

postprocessor
Calculation of contaminant movement when a contaminant source is applied to the face of a dam.
Model setup time: 7 minutes
Solution time: 10 seconds on PIII-1.0 GHz

 

SVFLUX.COM CHEMFLUX.COM SVHEAT.COM SVSOLID.COM SVDYNAMIC.COM SVAIRFLOW.COM SOILDATABASE.COM